If a resource is statused multiple times, for eg: If a foundation is statused as Form, Rebar and Stripped, and then synced back to the control project, only the last status I.e. Stripped is visible or recorded in the Control Project.
The Field app over-writes the statuses instead of keeping a log of them. Hope this makes it clear. I might have jumbled you up in the previous mail.